A concrete testing ground is a lengthy block
of concrete that is put on a certain amount of
power in specific intervals of time.
The resulting object shows the different stages
of hardening of concrete, and thus the formal
potential of the material concrete.
Necessary are: |
 |

a mashine |
 |

best concrete and lots of steel to hold it together
(total weight 450 kg) |
 |

a hammer |
 |

aiming ...
(12.59 o'clock) |
 |

... little power ...
(13.00 o'clock) |
 |

... every hour ...
(14.00 o'clock) |
 |

... all day and night.
(01.00 o'clock)
|
 |

result |
 |

the single stages ... |
 |

11.00 o'clock |
 |

12.00 o'clock |
 |

13.00 o'clock |
 |

14.00 o'clock |

|

15.00 o'clock |
 |

17.00 o'clock |
 |

18.00 o'clock |
 |

19.00 o'clock |
 |

21.00 o'clock |
 |

23.00 o'clock |
 |

01.00 o'clock |
 |
next is Sandfoto |
|
|
|
|
|
|
|
|